top of page
Abstract Mesh Texture Animation

Acid Gas Removal

Where every decision, model and column is engineered for absolute confidence.

ServiceS

Shaping the next evolution of your acid‑gas removal with unwavering mastery

Amine‑treating expertise that carries a project from first principles through modelling, engineered definition, safety assurance, plant optimisation, start‑up and knowledge transfer

Amine Process Strategy & Feasibility

We deliver targeted feasibility studies and process selection for acid gas treating using amine-based systems, assessing solvent type, process configuration, and integration with upstream and downstream units.Our work includes simulation and modelling of Hâ‚‚S and COâ‚‚ removal performance, evaluating design envelopes, operating scenarios, and optimisation opportunities to ensure technically robust and economically efficient solutions.

Acid Gas Treating Systems & Equipment Design

We design and specify critical acid gas treating equipment, including absorber and regenerator columns, lean/rich amine heat exchangers, and amine circulation systems. Scope also includes knockout drums, separators, and filtration packages, ensuring reliable operation, effective contaminant removal, and long-term system integrity.

Optimisation, Revamps & Operational Readiness

We perform revamp and debottlenecking studies to identify capacity constraints and improve plant performance with minimal capital expenditure and disruption.Our support extends through commissioning and start-up assistance, alongside tailored training courses to ensure effective operation, knowledge transfer, and sustained plant performance.

Engineering Design & Process Assurance

We develop complete Basic Engineering Design Packages (BEDP), including detailed process descriptions, design basis, and equipment specifications tailored to acid gas systems.Our team produces high-quality P&IDs and conducts HAZOP and process safety reviews to ensure safe, operable, and compliant designs aligned with industry standards and project requirements.

bottom of page